MLS # 17871004
Property Type
Duplex
Construction year
1994
The zoning does not permit a duplex, but a secondary unit is on-site.
This Magog property is strategically located in the Eastern Townships. It is approximately 27 km from Sherbrooke, about 25 minutes by car. This proximity to Sherbrooke facilitates access to the region's major services, businesses and institutions.
It is also a reasonable 120 km from Montreal, about 1 hour 20 minutes by car. by car. This makes it an ideal location for those who wish to enjoy the tranquility of Magog while remaining connected to major cities.
Heating system
Air circulation
Water supply
Artesian well
Heating energy
Bi-energy
Heating energy
Electricity
Heating energy
Propane
Windows
PVC
Foundation
Poured concrete
Siding
Vinyl
Basement
6 feet and over
Basement
Partially finished
Basement
Separate entrance
Roofing
Asphalt shingles
Distinctive features
No neighbours in the back
Distinctive features
Wooded lot: hardwood trees
Sewage system
Purification field
Sewage system
Septic tank
Zoning
Residential
Driveway
Double width or more
Equipment available
Wall-mounted heat pump
Hearth stove
Wood burning stove
Garage
Attached
Garage
Heated
Proximity
Highway
Proximity
Park - green area
Proximity
Bicycle path
Proximity
Elementary school
Proximity
Alpine skiing
Proximity
High school
Parking
Outdoor
Parking
Garage
Window type
Crank handle
Topography
Flat
Inclusions:
Curtains & Window Coverings, Dishwasher, Central Sweeper, Daycare Shelf, Mirror over Fireplace and Bathroom MirrorExclusions:
Curtains & Window Coverings, Dishwasher, Central Sweeper, Daycare Shelf, Mirror over Fireplace and Bathroom MirrorTaxes & Costs | |
---|---|
Municipal taxes (2025) | 3205$ |
School taxes (2025) | 498$ |
Total | 3703$ |
Monthly fees | |
---|---|
Energy cost | N.D.$ |
Evaluation (2025) | |
---|---|
Building | 450800$ |
Land | 75000$ |
Total | 525800$ |
Sacha De Santis
Taxes & Costs | |
---|---|
Municipal taxes (2025) | 3205$ |
School taxes (2025) | 498$ |
Total | 3703$ |
Monthly fees | |
---|---|
Energy cost | N.D.$ |
Evaluation (2025) | |
---|---|
Building | 450800$ |
Land | 75000$ |
Total | 525800$ |